The Waukesha Water Project is completing a pipe installation across Racine Ave. on Saturday, June 19, 2021 from 7am to 5pm. During this time period, the road will be closed to northbound traffic between Julius Heil Dr. and the National Ave. Connector Road. The roadway is currently closed to southbound traffic as well. Residents within the closure area will be directed to use the east side of Racine Ave. to access the National Ave. Connector Road. All other traffic should use the posted detour per the exhibit below.
If there are any emergency issues, the Great Water Alliance hotline is (262) 409-4444. The Great Water Alliance website:
http://greatwateralliance.com/